What should Pacific County PUD No. 2 customers plan before a service change?
Submit the PUD's completed new/revised-service application and application fee, with electric load information and a site plan. Engineering evaluates the request and supplies an estimate and instructions; arrange any required contract, easement, and assigned address.
- Obtain the electrical permit, install the required underground facilities, and obtain L&I approval before the PUD connects service.
- Confirm city requirements with Raymond and confirm project/address eligibility with the PUD; the page's city-contact sentence does not identify a different electric provider.
What should a panel replacement estimate in Raymond include?
A complete Raymond panel replacement estimate identifies the equipment, circuit work, service capacity, permit holder and final inspection records. Meter and utility connection work should be priced separately from a panel-only replacement.
- Confirm the serving utility for this Pacific County address.
- Include the load-review basis and the equipment you want to add.
- Identify restoration, utility charges and inspection closeout in the written scope.
Washington Office of Financial Management — 2026 April 1 city/town/county population and county associationWashington L&I: Electrical permits, fees and inspections
Raymond housing-age context
70.4% of housing units were built before 1980: 1,099 of 1,561 housing units. 2024 ACS 5-year estimates; universe: total housing units.
Calculation and uncertainty
Calculation: (B25034_007E+B25034_008E+B25034_009E+B25034_010E+B25034_011E)/B25034_001E. Variable: B25034 (year structure built). The derived share margin of error was not propagated. Source component and total margins of error are retained in the research data; this share is an estimate.
Building age does not establish electrical-panel condition or a need for replacement. Equipment condition and the planned work need their own assessment.
U.S. Census Bureau — 2024 ACS 5-year B25034 estimates and MOEsSources and scope
Primary-source research reviewed October 17, 2026 for raymond electrical panel replacement & service upgrades. Code, utility standards and administrative guidance have different roles. Confirm current requirements for the project address.
- Washington L&I — city electrical permits and inspections
- Washington Office of Financial Management — 2026 April 1 city/town/county population and county association
- Pacific County Comprehensive Plan (2010–2030), March 2010, Utilities Element (Final Draft), pp. 7-1–7-2
- Pacific County PUD New or Revised Electric Service
- Washington L&I: Electrical permits, fees and inspections
- U.S. Census Bureau — 2024 ACS 5-year B25034 estimates and MOEs
- U.S. Census Bureau — exact variable labels and universe
Get an estimate ↗