Does moving a panel also move the meter?
Moving a panel does not automatically move the meter because interior distribution equipment and utility metering have different responsibilities. A remodel can affect both, so the estimate should identify the equipment that will move and why.
- Include the proposed location and any nearby siding, addition or access work in the project details.
Who needs to approve the new meter location?
The serving utility and electrical inspection authority review a proposed meter location. Centralia requires an approved meter-base location, PSE directs customers to Construction Services for affected meter equipment, and Tacoma Power controls authorized service disconnect and reconnect.
- Confirm the location before ordering equipment or starting site work.
What work can change the meter relocation estimate?
A meter relocation estimate may include service-route work, overhead spans, underground conversion, trenching, easements, right-of-way permits and restoration. Utility charges and engineering can add to the scope even when interior panel work is straightforward.
- The proposal should identify who pays utility charges, prepares the site and coordinates disconnection and reconnection.
How do you keep a meter move from delaying a remodel?
Bring the proposed addition, exterior work and service route into the same planning discussion. Ask the utility to establish the meter-location requirements and the contractor to identify access and inspection needs before another trade closes the area.
- Specify temporary protection, wall or siding repair and the sequence for authorized utility work.
- Resolve electrical and utility acceptance before fixing the final exterior design.
Sources and scope
Primary-source research reviewed October 17, 2026 for electrical meter relocation and service entrance upgrades. Code, utility standards and administrative guidance have different roles. Confirm current requirements for the project address.